PROJECT GALLERY05
BTC Pipeline Fire Fighting Improvement Works
PROJECT SCOPE02
Multidisciplinary fire protection improvements across critical pipeline stations.
Site execution covering piping, mechanical, civil and structural, instrumentation and control, and electrical disciplines at PT1, PT3, PT4, IPT1 and IPT2 stations.
- 01
Multidisciplinary Site Implementation Works
- 02
Extension of the Foam Sprinkler System Protecting MOL Pumps
- 03
Pressure Relief Valve and Waste Cone for the Diesel Fire Pump
- 04
Addressable Beacons in High-Noise Areas
- 05
Gas Detection Systems in Confined Spaces
- 06
Relief System Nitrogen Skid Improvements
- 07
Fire Hydrant Modifications
- 08
Fire Separation of DCS, Communication and High-Voltage Areas
- 09
Construction of Benchmark Points at PT1
- 10
Replacement of Carbon Steel Spools at PT4 Utility Building 3
- 11
Passive Fire Protection (PFP) Application
- 12
NFPA-Compliant Fire Detection and Alarm System Upgrades
- 13
Autronica AutroSafe 3 to AutroSafe 4 Panel Upgrade
- 14
Jockey Pump Installation
- 15
Liner and Spool Installation for Existing GRE Pipes
FIELD NOTES03